Monica Bonvicini
RUN, 2012
12 mm ESG white-glass with inside IpaChrome coating, PVB Foil, 10mm TVG white-glass; DiBond mirror, stainless steel, stainless steel cover (with mirror polished surface), high-performance-LED in plastic cover
2150 x 900 x 1860 cm
Queen Elizabeth Olympic Park, London, commissioned in the framework of the London Olympic Games 2012.
Permanent Installation
Queen Elizabeth Olympic Park, London, commissioned in the framework of the London Olympic Games 2012.
Permanent Installation